Completion date: December 28, 2022
Location: Dover, NH
The customer had an existing box for access to the sewage line that needed to be replaced. We had to remove the old sewage box and replace it with a newer, higher-capacity sewage system. The customer was so grateful to have a dry basement to prevent future water and sewage intrusion.